Erha FPSO Integration

Client: Esso Exploration & Production Nig Ltd
Location of Project: Erha Deep Water Offshore Oilfields
Project Cost (est.): FPSO Cost US$ 700 Million
Date Commissioned: October 25, 2004
Date Completed: October 24, 2006
Special Features of Project: Erha is a Deepwater Oilfield development approximately 97km offshore Nigeria in water depths ranging from 1,000m to 1,200m. The development of this oilfield cost about US$3.5 Billion. The Erha FPSO is a large barge-shaped petroleum storage vessel with a displacement of approx. 345,000 tonnes with the capacity to hold 2.2 million tonnes of crude oil. FPSO topside facilities were designed to process 230,000 bpd of crude, 60,000bpd of water, 480,000 mmscfd gas. Fabrication of these facilities involved engineers in many disciplines.
Role: We supplied on a call-up basis, Systems and Quality Control Engineers and Fabricators for the integration of the topsides of the FPSO

Client :

Esso Exploration & Production Nig Ltd

Date :

August 8, 2018

Rating :